  • 21 With news in 30 days
  • 18 New in 30 days
  • 28 Events in 30 days
  • 5 Contract awards in 30 days

Projects available: 51

Sectors by share

  1. Transport & Infrastructure16 · 31.4%
  2. Power – Renewables7 · 13.7%
  3. Refining & Petrochemicals7 · 13.7%
  4. LNG4 · 7.8%
  5. Oil & Gas Upstream4 · 7.8%
  6. Nuclear3 · 5.9%
  7. Manufacturing & Industrial2 · 3.9%
  8. Mining & Metals2 · 3.9%
  9. Power – Gas/Coal2 · 3.9%
  10. Chemicals & Fertilizers1 · 2.0%
  11. Data Centers & Telecom1 · 2.0%
  12. Midstream/Pipelines1 · 2.0%
  13. Power – Grid & Storage1 · 2.0%

Projects by stage

  1. Awarded13 · 25.5%
  2. Study12 · 23.5%
  3. Construction10 · 19.6%
  4. Operation9 · 17.7%
  5. Commissioning2 · 3.9%
  6. FEED2 · 3.9%
  7. Tender2 · 3.9%
  8. FID1 · 2.0%

Biggest moves

  1. US$7.0bnPetkim Aliaga Petrochemical Master PlanPetkim, a subsidiary of SOCAR, is planning a USD 7 billion petrochemical Master Plan at Aliaga in Turkey, including an 850,000 tpy polyethylene complex and a mixed-feed steam cracker. FEED is under way with Technip Energies and Univation, and no final investment decision has been taken. FEED is due to finish by the end of 2027.Turkey · Refining & Petrochemicals
  2. US$3.0bnDAPEK Eastern Mediterranean Petrochemical ClusterPetrochemical plant in Ceyhan, Adana, Turkey, Turkey, led by Rönesans. Financing was arranged on 2 Jul 2026. Stage: Construction.Turkey · Refining & Petrochemicals
  3. US$1.5bnTVF Izmir Port UpgradeTVF İzmir Limanı plans a two-phase USD 1.5bn modernisation of the cargo side of the Port of İzmir in Turkey. Dredging to 17 metres for 400-metre ships is due to start in the first quarter of 2027 and take about two years. Alport, the cargo operator, targets 1.6 million TEU a year after dredging.Turkey · Transport & Infrastructure
  4. US$250mIstanbul North Rail Crossing (Istanbul Rail Bypass)The Ministry of Transport and Infrastructure is planning a 127 km rail bypass around northern Istanbul, with a stated cost of US$6.5 billion. The project is at the pre-tender stage: consultancy expressions of interest are open and four construction lots have been announced. The first construction tenders are expected later in 2026.Turkey · Transport & Infrastructure
  5. US$207mEnerjisa Enerji Distribution Grid ModernisationEnerjisa Enerji is modernising and expanding electricity distribution networks in the Baskent, Ayedas and Toroslar regions of Turkey. The EBRD announced a USD 207 million loan for the work on 2 Sep 2026, backed by an EU guarantee. The aim is to cut distribution losses and improve reliability.Turkey · Power – Grid & Storage

A free account lists every project of Turkey, with its owner, its stage and the sources behind every fact. Create a free account