Projects in Tanzania
- 10 With news in 30 days
- 6 New in 30 days
- 11 Events in 30 days
- 1 Contract awards in 30 days
Projects available: 24
Sectors by share
Projects by stage
Biggest moves
- US$42.0bnTanzania LNG ProjectLNG export terminal in Lindi, southern coast, Tanzania, led by Equinor; Shell. Stage: Study.
- US$2.9bnJulius Nyerere Hydropower ProjectThe Julius Nyerere Hydropower Project on the Rufiji River in Tanzania has 2,115 MW of capacity from nine 235 MW units behind a dam about 131 m high. It was inaugurated on 22 August 2026 and is connected to the national grid. Reported cost is TZS 7.452 trillion, funded from domestic government resources.
- US$1.4bnTAZARA Railway Rehabilitation and ConcessionThe TAZARA Railway, a 1,860 km line from Kapiri Mposhi in Zambia to Dar es Salaam in Tanzania, is being rehabilitated under a 30-year concession held by CCECC with USD 1.4bn of investment. The programme launched in November 2025 and was in its implementation phase by July 2026. It covers 32 locomotives and 762 wagons.
- US$1.2bnTanzania Standard Gauge Railway Lot 6 (Tabora-Kigoma)Tanzania is building a 506 km standard-gauge railway between Tabora and Kigoma, reported at USD 2.74 billion. A joint venture of China Railway Construction Corporation and China Civil Engineering Construction Corporation is building it, and work is more than 10 percent complete. Entry into service is scheduled for 2030.
- Mahenge Graphite ProjectMine in Mahenge, Tanzania, led by Black Rock Mining Limited; Government of Tanzania. Financing was arranged on 19 Nov 2026. Stage: Construction.
A free account lists every project of Tanzania, with its owner, its stage and the sources behind every fact. Create a free account