Projects in Norway
- 19 With news in 30 days
- 14 New in 30 days
- 24 Events in 30 days
- 11 Contract awards in 30 days
Projects available: 74
Sectors by share
Projects by stage
Biggest moves
- US$8.0bnKitebrook Infra Norway Data Center PlatformData center (US$8.0bn) in Vestland County: Matre (Masfjorden), Leirdøla (Luster) and Børdalen (Samnanger/Voss, sources differ), Norway, led by Kitebrook Infra. The plan was announced on 20 May 2026. Stage: Study.
- US$2.8bnSnøhvit FutureSnøhvit Future adds onshore compression and electrification to the Hammerfest LNG plant on Melkøya in Norway, and Equinor now puts its cost at NOK 26.5 billion. Work at the running plant is about 60% complete, with Aibel as main contractor. Onshore compression is planned for 2029 and electrification for 2030.
- US$900mLyraAker BP and DNO have taken a final investment decision on Lyra, a USD 900 million subsea tie-back to Gjøa in Norway. Subsea7 won an EPCI contract worth USD 150-300 million on 2 Nov 2026, and SLB OneSubsea a subsea systems contract on 5 Nov 2026. First oil is expected in the first half of 2028.
- US$424mMETCentre Floating Wind FarmFortius Offshore Wind AS plans two 18.5 MW floating turbines, 37 MW in total, at the METCentre demonstration site off Karmøy in Norway. Enova awarded NOK 2 billion in support on 30 Oct 2026, paid only if the project is built. The turbines are to be installed within five years.
- US$111mHydro Karmøy Wire Rod CasthouseNorsk Hydro is building a wire rod casthouse at its Karmøy smelter in Norway, with 110,000 tonnes per year of capacity and a stated cost of NOK 1.65 billion. Skanska holds the construction contract, about NOK 1.1 billion, reported on 7 Jul 2026. Completion is planned for March 2028.
A free account lists every project of Norway, with its owner, its stage and the sources behind every fact. Create a free account