Projects in Mexico

Clear
  • 25 With news in 30 days
  • 17 New in 30 days
  • 28 Events in 30 days
  • 5 Contract awards in 30 days

Projects available: 81

Sectors by share

  1. Transport & Infrastructure17 · 21.0%
  2. LNG10 · 12.4%
  3. Power – Renewables10 · 12.4%
  4. Mining & Metals9 · 11.1%
  5. Power – Gas/Coal9 · 11.1%
  6. Oil & Gas Upstream7 · 8.7%
  7. Chemicals & Fertilizers6 · 7.4%
  8. Midstream/Pipelines4 · 4.9%
  9. Manufacturing & Industrial3 · 3.7%
  10. Power – Grid & Storage3 · 3.7%
  11. Hydrogen/Ammonia/CCUS1 · 1.2%
  12. Refining & Petrochemicals1 · 1.2%
  13. Water1 · 1.2%

Projects by stage

  1. Study23 · 28.4%
  2. Construction16 · 19.8%
  3. Awarded12 · 14.8%
  4. Operation10 · 12.3%
  5. Tender7 · 8.6%
  6. Commissioning5 · 6.2%
  7. On hold/Cancelled4 · 4.9%
  8. FEED2 · 2.5%
  9. Not disclosed2 · 2.5%

Biggest moves

  1. US$3.5bnAmigo LNG Floating Export Terminal (Guaymas)LNG export terminal (US$3.5bn) in Catalina Bay, near Guaymas, Sonora, Gulf of California, Mexico, led by LNG Alliance. Stage: On hold/Cancelled.Mexico · LNG
  2. US$3.3bnPacifico Mexinol Methanol Complex (Topolobampo)Pacifico Mexinol is a 6,130 t/d methanol complex at Topolobampo in Sinaloa, Mexico, with a stated cost of more than USD 3.3 billion. Transition Industries reported an EPC agreement with Siemens Energy and Techint E&C for a 210 MW electrolyzer plant on 30 Oct 2026. Construction is expected to start in early 2027 once project financing is complete.Mexico · Chemicals & Fertilizers
  3. US$3.0bnFermachem Agro-Nitrogen Industrial ComplexAmmonia/urea plant in Lerdo, Durango, Mexico, Mexico, led by Fermachem. The plan was announced on 29 Jul 2026. Stage: Construction.Mexico · Chemicals & Fertilizers
  4. US$2.8bnSonora Energy Corridor Gas PipelineA 48-inch gas pipeline of about 500 km is planned between Naco and Guaymas in Sonora, Mexico, at USD 2.8 billion. LNG Alliance announced it with CENAGAS and Freedom LNG as partners. No construction timeline or final investment decision has been announced.Mexico · Midstream/Pipelines
  5. US$2.5bnECA LNG Phase 1Sempra Infrastructure is commissioning ECA LNG Phase 1, a one-train LNG export plant at Ensenada in Mexico. It shipped its first cargo in July 2026, then found damage to the refrigerant compressors. Substantial completion is now targeted for the fourth quarter of 2026.Mexico · LNG

A free account lists every project of Mexico, with its owner, its stage and the sources behind every fact. Create a free account