Projects in Kazakhstan
- 20 With news in 30 days
- 15 New in 30 days
- 26 Events in 30 days
- 3 Contract awards in 30 days
Projects available: 63
Sectors by share
Projects by stage
Biggest moves
- US$16.5bnBalkhash Nuclear Power StationNuclear plant in Shore of Lake Balkhash near Ulken, Zhambyl district, Almaty region, about 900 km southeast of Astana, Kazakhstan, led by Agency of the Republic of Kazakhstan for Atomic Energy. The plant started commercial operation on 7 Oct 2026. Stage: Awarded.
- US$10.0bnData Center ValleyData center in Ekibastuz, Pavlodar region, Kazakhstan. An agreement was signed on 15 Jun 2026. Stage: Study.
- US$7.7bnAtyrau Polyethylene Plant (Silleno)Petrochemical plant in Atyrau region, Kazakhstan, Kazakhstan, led by KazMunayGas. Construction started on 16 Nov 2026. Stage: Construction.
- US$6.0bnKarachaganak Gas Processing PlantQazaqGaz is building a gas processing plant at the Karachaganak field in Kazakhstan, sized for 5 billion cubic meters of raw gas a year, with a stated cost of USD 3.7 bn. A Hyundai Engineering and SICIM Kazakhstan consortium holds the EPC award, and a contract was reported signed on 12 Nov 2026. QazaqGaz expects construction to finish by 2030.
- US$1.8bnAktogay Copper SmelterKAZ Minerals Group is building a copper smelter at Aktogay in the Abai Region of Kazakhstan, producing 300,000 tonnes of cathode copper a year, with about USD 1.8bn invested. President Tokayev launched construction on 20 Oct 2026. The first cathode is due in 2030, two years after the 2028 commissioning date set in 2024.