Global Project Book

Projects in Ethiopia

Clear
  • 4 With news in 30 days
  • 2 New in 30 days
  • 5 Events in 30 days
  • 2 Contract awards in 30 days

Projects available: 13

Sectors by share

  1. Power – Renewables5 · 38.4%
  2. Mining & Metals3 · 23.1%
  3. LNG2 · 15.4%
  4. Transport & Infrastructure2 · 15.4%
  5. Chemicals & Fertilizers1 · 7.7%

Projects by stage

  1. Construction4 · 30.7%
  2. Awarded3 · 23.1%
  3. Study2 · 15.4%
  4. Commissioning1 · 7.7%
  5. FID1 · 7.7%
  6. On hold/Cancelled1 · 7.7%
  7. Operation1 · 7.7%

Biggest moves

  1. US$8.0bnBishoftu International AirportAirport in Bishoftu, about 40 km south of Addis Ababa, Ethiopia, led by Ethiopian Airlines Group. Financing was arranged on 12 Jun 2026. Stage: FID.Ethiopia · Transport & Infrastructure
  2. US$4.0bnDangote Ethiopia Fertilizer PlantDangote Group and Ethiopian Investment Holdings are building an ammonia and urea complex at Gode in Ethiopia, designed for 3 million tonnes of urea a year. Reported cost has risen from USD 2.5 billion to more than USD 4 billion. Técnicas Reunidas announced on 28 October 2026 a contract for two hydrogen reformers, due within 18 months.Ethiopia · Chemicals & Fertilizers
  3. US$4.0bnKoysha Hydroelectric ProjectHydropower (US$4.0bn) in Omo River, southwest Ethiopia, fourth dam of the Omo cascade, Ethiopia, led by Ethiopian Electric Power. Financing was arranged on 31 Aug 2026. Stage: Construction.Ethiopia · Power – Renewables
  4. US$1.7bnAwash–Kombolcha–Hara Gebeya RailwayThe Awash–Kombolcha–Hara Gebeya Railway is a 392 km electrified line in northern Ethiopia, built under a USD 1.7 billion turnkey contract signed in 2012. Work is suspended with about 92% complete, and a London tribunal ended the contractor dispute in Sep 2026. Ethiopian Railways Corporation owns the line.Ethiopia · Transport & Infrastructure
  5. US$500mAysha I Wind FarmAMEA Power plans to build the 300 MW Aysha I wind farm in Ethiopia, with Ethiopian Electric Power buying all output under a 25-year contract. The African Development Bank approved up to USD 110 million in July 2026 toward a cost of about USD 508 million. Financial close is the next step.Ethiopia · Power – Renewables

A free account lists every project of Ethiopia, with its owner, its stage and the sources behind every fact. Create a free account