Projects in Costa Rica
- 2 With news in 30 days
- 1 New in 30 days
- 2 Events in 30 days
- 0 Contract awards in 30 days
Projects available: 8
Sectors by share
Projects by stage
Biggest moves
- US$770mSan José - San Ramón Road Corridor ExpansionThe Ministry of Public Works and Transport published on 21 Oct 2026 a turnkey tender to widen 55.6 km of Route 1 between San José and San Ramón, financed by a USD 770 million loan from the Central American Bank for Economic Integration. Bids are due on 21 Apr 2027.
- US$220mICE 5G Network InfrastructureICE awarded its national 5G network in Costa Rica on 28 Apr 2026, with Ericsson taking the main contract at about USD 97.76 million over three years. The network uses Open RAN Stand-Alone. ICE expects deployment to take about 12 months once appeals are settled.
- US$43mCosta Rica Smart GridICE, the Instituto Costarricense de Electricidad, is rolling out 300,000 smart meters in Costa Rica, backed by an IDB Invest loan of up to USD 79 million and USD 21 million from the Climate Investment Funds. The financing was announced on 27 Jan 2026. No meter supplier has been named.
- US$2mPrysmian Costa Rica Cable FactoryFactory (US$2m) in Costa Rica, led by Prysmian. The plan was announced on 31 Aug 2026. Stage: Study.
- Costa Rica ICE Solar FarmSolar PV (20 MW) in Nandayure canton, Guanacaste, Costa Rica, Costa Rica, led by ICE. The plant started commercial operation on 14 Nov 2026. Stage: Commissioning.
A free account lists every project of Costa Rica, with its owner, its stage and the sources behind every fact. Create a free account