Projects in Bhutan
- 3 With news in 30 days
- 3 New in 30 days
- 4 Events in 30 days
- 1 Contract awards in 30 days
Projects available: 14
Sectors by share
Projects by stage
Biggest moves
- US$2.8bnPunatsangchhu-I Hydropower ProjectPunatsangchhu-I is a 1,200 MW hydropower project in Bhutan funded by India through a 40% grant and a 60% loan. Dam construction restarted on 10 April 2026 after a halt that began in 2019, with physical progress at 87.75%. Completion is targeted within about five years.
- US$515mDorjilung Hydropower ProjectDorjilung Hydro Power Limited is developing the 1,125 MW Dorjilung run-of-the-river plant on the Kurichhu River in Bhutan, at INR 13,100 crore. Druk Green Power Corporation owns 60% and Tata Power 40%, and Patel Engineering and Rigsar Construction hold the pre-construction contracts. Commissioning is planned for Sep 2031.
- US$59mDruk Green Power Wobthang Solar FarmSolar PV (120 MW) in Wobthang, Bhutan, led by Druk Green Power. A letter of intent was signed on 11 Nov 2026. Stage: Awarded.
- DGPC Bhutan Solar PlantSolar PV (7.8 MW) in Thimphu, Chhukha and Basochhu, Bhutan, Bhutan, led by DGPC. The plant started commercial operation on 6 Nov 2026. Stage: Commissioning.
- Patel Greentech Bhutan FactoryFactory in Bhutan, led by Patel Greentech. The plan was announced on 3 Nov 2026. Stage: Study.
A free account lists every project of Bhutan, with its owner, its stage and the sources behind every fact. Create a free account