Projects / P12297
SaskPower North-South Transmission Line
SaskPower
Two new transmission lines of about 250 km each would link the northern and southern SaskPower grids in Saskatchewan. SaskPower is prequalifying EPC contractors, with the request closing on 14 Dec 2026. An award decision is targeted for spring 2028 and in-service for about 2032.
Canada
Power – Grid & Storage
Tender
transmission line Owner: SaskPower Reported · 1 source
Latest news: 22 Nov 2026
Map
Saskatchewan, between the E.B. Campbell Hydroelectric Station area and the Island Falls Hydroelectric Station area, Canada.