Projects / P12264
NeToo Hydropower Project
Hydropower in Nechako Canyon, between Cheslatta Falls and the Kenney Dam, Nechako River Basin, Canada. A feasibility study was reported on 20 Nov 2026. Stage: Study.
Canada (inferred from location)
Power – Renewables
Study
hydropower Owner: Not disclosed Reported · 2 sources
Latest news: 20 Nov 2026
Map
Canada, whole country: no exact coordinate in the sources.