Projects / P11271
Long Phu 1 Thermal Power Plant
Petrovietnam
Petrovietnam is restarting the 1,200 MW Long Phu 1 coal-fired power plant in Vietnam, at a stated cost of about USD 1.5 billion. Work stalled in 2019. On 11 November 2026 Petrovietnam signed an equipment contract with Harbin Electric International, and operation is targeted for 2027.
Vietnam
Power – Gas/Coal
Construction
Owner: Petrovietnam Reported · 1 source
Latest news: 11 Nov 2026
Map
Long Phu district, Soc Trang province (now part of Can Tho city), Vietnam, Vietnam.