Global Project Book

Projects / P07951

Cavendish Dock Floating Solar Farm

ABP · Cavendish Dock, Barrow-in-Furness

Solar PV in Cavendish Dock, Barrow-in-Furness, United Kingdom, led by ABP. The plan was announced on 16 Oct 2026. Stage: Study.

United Kingdom Power – Renewables Study solar PV Owner: ABP Reported · 1 source Latest news: 16 Oct 2026

Map

Map of Cavendish Dock, Barrow-in-Furness, United Kingdom with a point on the project

Cavendish Dock, Barrow-in-Furness, United Kingdom.

More with an account

See the sources behind every fact, the full timeline and who is building it. Free account, no card.

Create a free account