Projects / P06815
Teddington Direct River Abstraction Project
Thames Water
Thames Water is planning a drought scheme at Teddington that would take up to 75 million litres a day from the Thames, backed by a 4.2 km tunnel and a treatment plant at Mogden, at a reported GBP 500 million. It cancelled its separate tunnelling tender in Aug 2026. A combined procurement is due before the end of 2026.
United Kingdom
Water
Tender
water/wastewater plant Owner: Thames Water Reported · 1 source
Latest news: 28 Aug 2026
Map
Teddington, with a treatment plant at Mogden Sewage Treatment Works, London, United Kingdom, United Kingdom.