North West Transmission Developments
TasNetworks
TasNetworks is upgrading the north-west Tasmanian grid with about 238 km of double-circuit lines, about 390 new towers and substation upgrades, in two stages costing AUD 1.5 billion. Stage One is under construction with Genus as head contractor, after a notice to proceed reported on 31 Aug 2026. Stage Two depends on the second Marinus Link cable.
Australia
Power – Grid & Storage
Construction
transmission line Owner: TasNetworks Reported · 1 source
Latest news: 31 Aug 2026
Map
Palmerston (Cressy) to Burnie via Sheffield and Heybridge, Tasmania, Australia, Australia.