Global Project Book

Projects / P06523

N-HYPPADEC River Gurara Embankment

N-HYPPADEC · River Gurara

Dam/flood control in River Gurara, Nigeria, led by N-HYPPADEC. A contract was awarded on 21 Aug 2026. Stage: Awarded.

Nigeria Water Awarded dam/flood control Owner: N-HYPPADEC Reported · 1 source Latest news: 21 Aug 2026

Map

Map of River Gurara, Nigeria with a point on the project

River Gurara, Nigeria.

More with an account

See the sources behind every fact, the full timeline and who is building it. Free account, no card.

Create a free account