Projects / P06361
ARECO Philippines Solar Farm
ARECO · 50 MW · Bacolod City, Negros Island, Philippines
Solar PV (50 MW) in Bacolod City, Negros Island, Philippines, Philippines, led by ARECO. An agreement was signed on 19 Aug 2026. Stage: Study.
Philippines
Power – Renewables
Study
solar PV Owner: ARECO Reported · 1 source
Latest news: 19 Aug 2026
Map
Bacolod City, Negros Island, Philippines, Philippines.