Projects / P05593
Tantangan Solar Project
Apolaki Seven Inc.; IbVogt · 74.5 MW · Tantangan
Solar PV (74.5 MW) in Tantangan, Philippines, led by Apolaki Seven Inc.; IbVogt. The plant started commercial operation on 23 Jul 2026. Stage: Operation.
Philippines
Power – Renewables
Operation
solar PV Owner: Apolaki Seven Inc.; IbVogt Reported · 8 sources
Latest news: 24 Jul 2026
Map
Tantangan, Philippines.