Projects / P05489
Mangystau Hybrid Power Plant
Eni · 120 MW · Zhanaozen, Mangystau Region, Kazakhstan
The Mangystau Hybrid Power Plant is a 247 MW project in Kazakhstan, combining a 120 MW gas plant, 50 MW of solar and a planned 77 MW wind farm. Eni holds 51% and KazMunayGas 49%, with a stated cost of USD 322.5m. The gas plant produced first power on 22 Jul 2026; the wind farm is planned for 2027.
Kazakhstan
Power – Gas/Coal
Commissioning
gas-fired power plant Owner: Eni Reported · 2 sources
Latest news: 25 Nov 2026
Map
Zhanaozen, Mangystau Region, Kazakhstan, Kazakhstan.