The Mangystau Hybrid Power Plant is a 247 MW project in Kazakhstan, combining a 120 MW gas plant, 50 MW of solar and a planned 77 MW wind farm. Eni holds 51% and KazMunayGas 49%, with a stated cost of USD 322.5m. The gas plant produced first power on 22 Jul 2026; the wind farm is planned for 2027.

Kazakhstan Power – Gas/Coal Commissioning gas-fired power plant Owner: Eni Reported · 2 sources Latest news: 25 Nov 2026