Projects / P04714
Aboitiz Renewables San Manuel Solar Farm
Aboitiz Renewables · 92.5 MW · San Manuel, Pangasinan
Solar PV (92.5 MW) in San Manuel, Pangasinan, Philippines, led by Aboitiz Renewables. The plant started commercial operation on 4 Jul 2026. Stage: Operation.
Philippines
Power – Renewables
Operation
solar PV Owner: Aboitiz Renewables Reported · 3 sources
Latest news: 4 Jul 2026
Map
San Manuel, Pangasinan, Philippines.