Projects / P04668
Portugal-Spain Power Interconnector
1,000 MW
Transmission line (1,000 MW) in Viana do Castelo to Pontevedra, crossing near Melgaco and Arbo. The plan was announced on 6 Jul 2026. Stage: Study.
Country not disclosed
Power – Grid & Storage
Study
transmission line Owner: Not disclosed Reported · 1 source
Latest news: 6 Jul 2026