Projects / P02744
Masdar Abu Dhabi Round-the-Clock Solar and Storage Project (5.2 GW PV, 19 GWh BESS)
Masdar · 2,000 MW · Abu Dhabi
Solar PV (2,000 MW) in Abu Dhabi, United Arab Emirates, led by Masdar. The project was put on hold or cancelled on 26 Aug 2026. Stage: Construction.
United Arab Emirates
Power – Renewables
Construction
solar PV Owner: Masdar Reported · 16 sources
Latest news: 26 Aug 2026
Map
Abu Dhabi, United Arab Emirates.