Projects / P02300
Dongo Kundu LNG Power Plant
AMACO Energy · Dongo Kundu, Mombasa
Kenya plans a 1,200 MW gas-fired power plant at Dongo Kundu in Mombasa, running on imported LNG, at a reported cost of USD 2.9 billion. It is at an early stage, with a viability study being set up and no funding secured. Phases run from 2028 to 2032.
Kenya
Power – Gas/Coal
Study
gas-fired power plant Owner: AMACO Energy Reported · 1 source
Latest news: 20 Nov 2026
Map
Dongo Kundu, Mombasa, Kenya.