Projects / P02148
NEOM Transmission Line
NEOM · 3,000 MW · NEOM
Transmission line (3,000 MW) in NEOM, Saudi Arabia, led by NEOM. A contract was awarded on 18 Apr 2026. Stage: Awarded.
Saudi Arabia
Power – Grid & Storage
Awarded
transmission line Owner: NEOM Reported · 1 source
Latest news: 18 Apr 2026
Map
NEOM, Saudi Arabia.