Projects / P01828
Neoen Japan Battery Storage Facility
Neoen · 100 MW · Hyogo Prefecture, Japan
BESS (100 MW) in Hyogo Prefecture, Japan, Japan, led by Neoen. The plan was announced on 2 Apr 2026. Stage: Study.
Map
Hyogo Prefecture, Japan, Japan.
Projects / P01828
Neoen · 100 MW · Hyogo Prefecture, Japan
BESS (100 MW) in Hyogo Prefecture, Japan, Japan, led by Neoen. The plan was announced on 2 Apr 2026. Stage: Study.
Hyogo Prefecture, Japan, Japan.