Projects / P01712
NTPC Simhadri Battery Storage System
NTPC · 250 MW · Nabinagar
BESS (250 MW) in Nabinagar, India, led by NTPC. A contract was awarded on 28 Apr 2026. Stage: Awarded.
Map
Nabinagar, India.
Projects / P01712
NTPC · 250 MW · Nabinagar
BESS (250 MW) in Nabinagar, India, led by NTPC. A contract was awarded on 28 Apr 2026. Stage: Awarded.
Nabinagar, India.