Projects / P01403
Limbauan Solar Power Project (PetroGreen Isabela Solar Farm)
PetroGreen Energy · 33 MW · San Pablo, Isabela
The Limbauan solar project in San Pablo, Isabela, is about 40 MWDC, or 33 MWAC, with a stated cost of PHP 1.9 billion. PetroGreen Energy is behind it through a subsidiary, and the plant already exports power. Rizal Commercial Banking Corporation signed a loan of up to PHP 1.24 billion for it on 6 Oct 2026.
Philippines
Power – Renewables
Operation
solar PV Owner: PetroGreen Energy Reported · 3 sources
Latest news: 6 Oct 2026
Map
San Pablo, Isabela, Philippines.