Global Project Book

Projects / P01403

Limbauan Solar Power Project (PetroGreen Isabela Solar Farm)

PetroGreen Energy · 33 MW · San Pablo, Isabela

The Limbauan solar project in San Pablo, Isabela, is about 40 MWDC, or 33 MWAC, with a stated cost of PHP 1.9 billion. PetroGreen Energy is behind it through a subsidiary, and the plant already exports power. Rizal Commercial Banking Corporation signed a loan of up to PHP 1.24 billion for it on 6 Oct 2026.

Philippines Power – Renewables Operation solar PV Owner: PetroGreen Energy Reported · 3 sources Latest news: 6 Oct 2026

Map

Map of San Pablo, Isabela, Philippines with a point on the project

San Pablo, Isabela, Philippines.

More with an account

See the sources behind every fact, the full timeline and who is building it. Free account, no card.

Create a free account