Coastal Power SAOC · 890 MW

Coastal Power SAOC is building a combined-cycle gas plant of about 890 MW in the Duqm Special Economic Zone in Oman, at USD 910 million. SEPCOIII and Doosan Enerbility are the EPC contractors. Construction began in September 2026 and commercial operation is planned for 2029.

Oman Power – Gas/Coal Construction gas-fired power plant Owner: Coastal Power SAOC Reported · 11 sources Latest news: 28 Sep 2026