Projects / P00945
Strawberry High Line Pipeline
Central Utah Water Conservancy District
The Central Utah Water Conservancy District plans to replace the open Strawberry High Line Canal in Utah with a buried pressurized pipeline, at about USD 750 million. A Jacobs and Bowen Collins joint venture holds an engineering contract of up to USD 81.706 million. Construction is targeted for 2027 and operation for 2032.
United States
Water
Study
pipeline Owner: Central Utah Water Conservancy District Reported · 1 source
Latest news: 30 Sep 2026
Map
South Utah County and eastern Juab County, Utah, United States, United States.