Projects / P00636
East Coast Railway Infrastructure Project
East Coast Railway
East Coast Railway is adding a third line on two stretches of the 385 km Bhadrak–Vizianagaram section: 22 km from Nergundi to Barang and 363 km from Khurda Road to Vizianagaram. RVNL received the Letter of Acceptance on 18 September 2026 for the engineering, procurement and construction package, valued at INR 404.88 crore including GST, with a 912-day execution period.
India
Transport & Infrastructure
Awarded
rail/metro Owner: East Coast Railway Reported · 4 sources
Latest news: 18 Sep 2026
Map
Nergundi–Barang and Khurda Road–Vizianagaram on the Bhadrak–Vizianagaram section, Odisha, India.